Friday, February 19, 2010
Jackhammer
Jack-hammering the basement floor of what will be a new bathroom, to lay the piping. We had to pour a concrete slab in the basement, 1100 sq.ft. because the floor was originally just dirt under the floorboards. But this is the only place where there was already concrete.. and it was too high to lay pipe.